Four Winds Casino Resort - New Buffalo, MI

Michael Constantini was the Project Director for the Four Winds Casino Resort, a $180,000,000 project with a 14 month fast track schedule.
Worked with Christman Construction and Kraus Anderson in a joint venture relationship which consisted of: a single story steel structure casino - 3,000 slot machines with high end interior finishes, precast concrete parking structure - capacity for 2,200 vehicles, six story post tension concrete hotel - 166 keys, two story human resource building – 45,000 sf., emergency back-up generator building and over 3 miles of infrastructure, parking lots and extensive landscaping enhancements.
Worked with Christman Construction and Kraus Anderson in a joint venture relationship which consisted of: a single story steel structure casino - 3,000 slot machines with high end interior finishes, precast concrete parking structure - capacity for 2,200 vehicles, six story post tension concrete hotel - 166 keys, two story human resource building – 45,000 sf., emergency back-up generator building and over 3 miles of infrastructure, parking lots and extensive landscaping enhancements.
Lambeau Field - Green Bay, WI

Michael Constantini was the Director of Field Operations for Turner Construction Company at Lambeau Field during the 3-year, $295 Million dollar renovation project. The new Lambeau Field complex was completed on time and in budget without any interruptions to Packer home football games.
<more>
<more>
FEDEX Field - Washington, DC

Assisted Turner Construction Company with project coordination of stadium addition.
Approximately 5,000 seats were added to the existing NFL stadium and construction of eleven new luxury suites. Modification and extension of existing upper indoor club suites including bar area, and new structural frame to accommodate additional general seating on one side of the stadium. Aggressive 16-week schedule.
Approximately 5,000 seats were added to the existing NFL stadium and construction of eleven new luxury suites. Modification and extension of existing upper indoor club suites including bar area, and new structural frame to accommodate additional general seating on one side of the stadium. Aggressive 16-week schedule.
New York Giants Stadium - Meadowlands, NJ
Assisted Hammes Company Sports and Development with preconstruction services for the New York Giants Stadium Project.
Lincoln Financial Field - Philadelphia, PA
Assisted Turner Construction Company with closeout procedures at new NFL stadium.
Wrigley Field - Chicago, IL
Preconstruction work for Chicago Cubs executive skyboxes at Wrigley Field. (TCCO)